A lagoon was constructed off the river at the southwest corner to allow boating xlviii. The new
landscaping interfered with a crossing point at what had previously been the main entrance.
An additional footbridge was therefore needed across the lagoon. It was constructed
alongside the southern boundary. A footpath along a narrow island connected the two
bridgesxlix.