Due to its lack of use during the war, the boating lake had deteriorated and had now become expensive to maintain. Regular dredging operations had to be made to remove silt. The boating lake filled in income from boating charges fell far short of the cost of repair and maintenance. It was therefore decided to fill in the lake and re-landscape the areacxi. After filling in, the ground was left to settle for some fifteen years.